Wiring harness for the canopy/panel LED string with shrinkwrap, protective sleeve, and Molex connectors. Necessary to have a good harness to protect this harness because it is moved with each cycle of opening/closing the canopy.
Fabricated most of a new harness for the AP Roll servo, but not finished. For the SV-Net operations (Hub in the equipment bay).
Evaluated canopy ejection release mechanism and how to fabricate the the T-Handle. Do not anticipate or desire airborne release but need a reliable method to release the canopy for removal on the ground. Concluded with design and will fabricate in a few days.
Removed the left side canopy latch/lug and elongated bracket holes to get reasonable pressure on closing, without too much resistance.