Added grommets and heat shrink to the tail-light wiring, and routed it through the aft bulkheads to the rudder bottom fairing. Aligned the Heim fittings in the rudder. Time to finalize the empennage - rivet the elevator stops, and bolt it all together soon.
Then more work on circuits and connectors for the VP-100.
Received the 'new' Vans fairing for the HS/Elevators (still can't find my originals), but the new gray ones are good fits. Had to trim and fit edges but that was quick. Have to drill, and close up the ends.