|
|
RV-6A - GBC
|
Date: 10-26-2013
|
Number of Hours: 2.00
|
Manual Reference:
|
Brief Description: Cowl Trimming
|
|
Made some adjustments in the FW (aft) edges of the cowl, sitting high and to the right at the spinner. Install/Remove, trim, repeat, measure, mark, repeat. Adjust the 'temporary 3-eyelet hinge" used as a quick attach point.
Straightened the edges a tat, and did other shop and kit organizing.
Spent may hours during the day with Bob and Gene (EAA228) talking, mentoring, and practicing metal working, riveting and using different tools. Gene is starting an RV-9.
Spent two previous days at EAA CopperState Fly-in (CGZ) and volunteered to help with camp-ground registration. Reviewed my Dynon plans with the reps, and visited lots of planes on the tarmac.
|
|
Not much to show
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |