Combination of tasks but the mounting of the Dynon ADS-B In module in the left side of the equipment bay was a milestone. Simple design of the bracket, fabrication of the fasteners, and connection of the Serial (Tx/Rx) leads to the SkyView ports (assigned to #4). The configuration was a bit more complex, in the SV EFIS Setup screens to define what device was communicating on Port #4.
Drilled out about 4 rivets in the aft skin, and installed replacements to correct a few poorly formed shop heads. There are several others to replace but they are not do-able solo.
BTW, removed rear window to be able to reach some of the replacement rivets.
Was able to succesfully load the generic (test) CheckList, and open that in the TOOLS menu. Now ut can be fleshed-out with details and content. (Same info will be in a hardcopy POH, carried in A/C at all times).