Converting the VP-100 wiring pin assignments to the VP-X assignments, moving the pins to new Molex MX150L connectors for a soon to be acquired VP-X. Online configuration and manually checking the print-outs against the pins, and ECB values (Amps & Switches).
Temporary installation of the Dynon panel compoents for testing the repaired SV display, and custom comm cable from SteinAir. Found that I needed to make connector changes to be able to 'bench test' equipment using only partial connection to the plane wiring. F-M plugs consistency and wire assignments.
Had to setup fuse block and switches to bench test.