KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  5-14-2016
Number of Hours:  7.00
Manual Reference:  
Brief Description:  New Alternator, Sump & other bolts

Made a cheat-sheet with all torque specs for bolts, hoses and fittings. Torqued the intake & exhaust bolts/nuts.

Cleaned up all the sump fasteners and installed with appropriate new star washers, then completed the entire sump to an even 30 in-lbs to start, and will make a 2nd pass as soon as position of cable clamps is final.

Removed the old Kelly Aerospace alternator and installed the replacment Plane Power 60A unit and all new fixtures and belt. Safetied the brackets and attached the wiring.

Hung the lower cowl to compare clearance - fabulous. Need to now fiberglas over the cowl hole, no bump needed.
' style=

Kelly alternator

Kelly alternator

' style=

Plane Power replacement

Plane Power replacement

' style=

High & Tight in comparison

High & Tight in comparison

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.