KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  4-4-2016
Number of Hours:  5.50
Manual Reference:  
Brief Description:  FI - Cables & distribution

Finished the modification of the AFP FI distribution 'spider' with safetie of fasteners, torqued fittings/sealed, and secured all the SS tubes and bolts.

Fastened AFP FI to sump and had to modify the throttle cable bracket which for some reason did not fit well around engine mount tube. Had to swap position of angel, and add 2 new holes for bracket. One change is the engine control cables are mounted on the 'plane' of the instrument panel and this moves the cables upto 1" further. (May need to order new throttle cable).

Fabricated a tube to test the attachment of the remotely mounted oil cooler to the aft side of the Lt baffle. Will have to have this welded Unsed .032" sheet to test. Needs more drafting.
' style=

Throttle Cable

Throttle Cable

' style=

Mixture Cable

Mixture Cable

' style=

Mockup - 4

Mockup - 4" tube to SCAT

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.