KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  3-26-2016
Number of Hours:  4.50
Manual Reference:  
Brief Description:  FWF - Sensors

Ignored the airport Open House and worked on the FWF wiring for sensors. These are wired to the Dynon EMS, D37 harness.

Wired the 3 leads for the "Red Cube" (FT-60), with label and shrink wrap connected with a 3 position Molex.

Terminated the Oil Temp lead (and mis-labeled it Oil Pres) ... have to fix that Monday. Then put together a terminal strip for the 3 sensors that share a common ground and power to the EMS; 1) MAP 2) Oil Pres, and 3) Fuel Pres.

Remaining sensors are CHT and EGT, already to go now. Next step is clean-up on the cabin heat actuator, and vent. Then seal the FW recess and vent. Almost ready to hang the engine.
' style=

Overview

Overview

' style=

FT-60

FT-60 "Red Cube"

' style=

Shrinkwrapped & labeled

Shrinkwrapped & labeled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.