Powered By Kitlog Pro v2.0
RV-6A - GBC
RV-6A QB
Engine
10-13-2013
< Previous Log Entry
Next Log Entry >
Date:
10-13-2013
Number of Hours:
3.50
Manual Reference:
Brief Description:
Engine Baffles - 9th step
Finished the right inlet ramp, forward side panel. Riveted and primed, assembled and installed.
Aft side panels - pretty straight forward, debur, scuff, prime, rivet, and assemble. Minor fitting and a little trimming.
Next step will be the aft panels - expect challenges. Not standard with the conical mount, some variations from plans.
Top edge has not been measured to fit with rubberized baffle material.
Left aft - side panel
Right aft - side panel
Left forward - ramp
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-6A QB Home
Category
# Logs
# Hours
All
1255
3573
Avionics
77
222
Controls
50
143
Electrical
133
440
Empennage
48
140
Engine
126
392
Finishing Kit
165
457
Fuel System
51
156
Fuselage
317
864
Gear
37
87
Miscellaneous
45
109
None
9
13
QuickBuild RV-6A Kit
6
5
Shop Supplies
1
1
Tools
12
20
Wings
147
455
Workshop
31
69
Copyright © 2001-2024 Matronics. All Rights Reserved.