KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  7-1-2016
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Rudder - bottom fairing & pivots

Removed rudder and adjusted the Heim joints, to align and improve clearance of bottom fairing. Har to remove and sand some material from the front lower area to gain clearance, too. And, had to use the die-grinder to removed unneeded material from the sheet metal of the tie-down bracket.

Checked call-outs for fatteners and swapped test bolts for final hardware.

Need to torque everything but also need to remove rudder and finish 1) balancing, and 2) the fiberglass fairings. Also need to add a screw ground point for the tail light on the VS spar.
' style=

Tie-down hits fairing

Tie-down hits fairing

' style=

Trimmed interference

Trimmed interference

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.