KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  6-17-2013
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Prep job box for hangar

Brushed out the dirt, leaves, and stuff, then hammered out some dents in a JobBox that was donated by a friend who's moving. Used the cherry-picker to tilt and lift easily into the pickup bed.

Will take to hangar and use to secure tools in a 'metal tool box' to keep the Fire Marshal happy.

Need to get the cherry-picker to the hangar to unload in from the pickup.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.