Reviewed the section on the wing installation, including fitting the ailerons, flaps, and control mechanisms. Had already fabricated the bellcrank. Located push tube components, bellcrank, and all brackets for the ailerons. Need to locate the hinge-half for the wing side of the flap hinge.
Test fit the aileron brackets, gap seals, and flap braces. Brushed out the Rt wing from 9yrs+ of hanger dust. Will have to wipe down with a damp cloth, too.
NOTE: The flap brace will sit exactly on a row of universal head rivets, the manual says to use a Unibit to drill out only enough of a hole at each of these to allow the brace to sit on the spar flat.