KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
' style=
Date:  8-11-2018
Number of Hours:  3.00
Manual Reference:  Step 8
Brief Description:  Canard Covers

To provide for a flange for connection, a flange was installed to the canard on each side and went up about 2" on the foam. Peel ply was installed on the inside to allow another layup facing inward at a later time.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.