KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
' style=
Date:  4-24-2020
Number of Hours:  4.00
Manual Reference:  Step 3
Brief Description:  Installing the Electric Nose Gear System

The panel was modified to accept the switch control for the nose gear. The circuit breaker holes were also drilled. The intention was to install the electric circuit up to the circuit breaker. The circuit breaker was to be powered by a 12V power supply. The wiring has not been completed yet due to missing connector parts. They are on order.

The forest of tabs ground block was installed on the copilot fuselage wall. The automatic extension circuit box for the nose gear was installed on F22 using click bonds.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.