10/02/2005 - Cut out the foam for the F22 bulkhead and the F22 bulkhead doubler. 10/03/2005 - Epoxied the three halves of the F22 bulkhead together. 10/12/2005 - Cut out the F28 bulkhead 10/15/2005 - Sanded F-22 and doubler to shape. Cut out the BID and UNI to cover the F-22 and F-28 10/16/2005 - Layed up 2 bid on F22 and F28. 1 UNI on F28. Microed Doubler to F22 and layed up 2 BID and 1 UNI on doubler. Peel plyed entire surface and weighted with concrete blocks. 10/17/2005 - Trimmed the F22 and F28 gross amount of excess 10/18/2005 - Trimmed the rest of F22 and F28 using a jigsaw and a dremel 10/19/2005 - Cut the glass cloth for the front side of the F22 and F28 bulkheads. 10/22/2005 - Glassed the aft side of F22 and F28. F22 had 2 BID and 1 UNI overall and then 5 UNI and 4 BID on each upright. 10/23/2005 - Trimmed the glass on the F22 and F28. These are finished!