Date:  11-10-2020
Number of Hours:  10.42
Manual Reference:  
Brief Description:  42MiS/U-28

03/25/20: 4.48Hrs
1 Completed. The main harness wires were secured to the clamps on F-01230-1

03/04/20: 0.5Hrs
Worked on step 2 by deburring the four F-01212A brackets.

03/05/20: 3.62Hrs
2: The wire routing brackets were riveted to F-01212L & R and the wires were inserted into their slots.
03/12/20: 0Hrs
3: After routing the WH-P30 cable forward and through the routing brackets, the last snap bushing was installed on F-12103 completing this step.

4: The audio alert cable was connected to the remote.
6: F-12123B was glued to F-12123A.


03/17/20: 0.22Hrs
7: The 10 spare fuses required by the POH were installed in F-12123A.
8: F-12123B was glued to the bottom of F-01202B-1 along with F-12123A.

03/24/20: 1Hr
Worked on step 1.



11/10/20 .5Hrs
5: the fuel tank was reinstalled.