KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  11-14-2020
Number of Hours:  3.37
Manual Reference:  
Brief Description:  42MiS/U-08

03/03/20: 2Hrs
2: The antenna cable was installed onto the positioned ELT antenna.
3: A snap bushing was modified and installed and placed over the antenna cable.
4: A step drill was used to expand the 1/4" to 3/8", then a bushing was installed.
5: The snap bushings called out were installed onto F-01204B-R-1 & L, F-01204F-R-1 & L, F-01224-R-1 & L.
6: The two F-00200 switch spacers were separated.
7: F6262 was connected to a ES E22-50K spar pin switch.

03/04/20: 0.67Hrs
8: One F-00200 and ES E22-50K were installed onto the bottom of F-01248-R-1 along with F6262.
9: The snap bushings were installed in F-1204C-R & L and F-01204G-R & L

11/14/20 .7Hrs
1: The E-04.8 ELT Antenna was installed onto the F-01205B-1
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.