KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  8-21-2020
Number of Hours:  3.10
Manual Reference:  
Brief Description:  42NiS-20

8/20/20 2.5Hrs

1: The F-0043-1, F-00044-2 and F-0144 were installed.
2: The PTT was attached to F-00144.
3: The GDU 460 was installed.

8/20/20 0.6Hrs

4: The GTR 200B was installed.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.