KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  3-18-2021
Number of Hours:  7.00
Manual Reference:  
Brief Description:  36iS/U-02

1. The U-00001A was laid up thicker area was sanded out to match the thickness all along.
2. The tire opening of the U-00001A was trimmed and dimples were drilled,
3. The fairing halves have a good fi. The dimples were drilled.
4. The tire opening of the U-00001B was trimmed and the dimples were drilled.
5. Each U-00002 are straigh.
6. All nutplates rivet holes on both U-00002 were final-drilled #40 and countersank.
7. The nutplates of the four U-00002 were rirveted,
Both, left and right were worked on
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.