KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  10-10-2020
Number of Hours:  13.50
Manual Reference:  
Brief Description:  41A-02

10/08/20 4.5Hrs

The inside fiberglass of the foward canopy to match canopy frame was painted.

10/08/20 4.1Hrs
1. The inside canopy surface was covered with protective tape one inch wide adjacent ton the base aluminum.
2. The edge of the CA-00010 was trimmed 1/8 wide oif the trim line.
3. The notch was rough cut for fitting over the canopy frame C-1206 guide plate at the aft end of the canopy frame.
4. The molding was clamped in place.
5. A very slight gap was reached by sandig its edges.

10/10/20 4.9 Hrs

6. The molding was clamped in place and its lower edge overhang was marked for trimming. The gap between the canopy and the fuselage deck was minimized.
7. The canopy molding was painted.
8. A bed of adhesive was appplied to the canopy frame for its installation.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.