KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  3-23-2020
Number of Hours:  8.01
Manual Reference:  
Brief Description:  38iS/U-09

03/10/20: 3.5Hrs
1 & 2: The holes on F-01207C-L&R had already been match-drilled #30 so the F-1284L&R were riveted to them.
3: Both F-01273-1 were clecoed to the fuselage.
4: The two holes called out on each F-01270A-1were final-drilled #19.
Worked on 5.

03/11/20: 2.33Hrs
Continued working on step 5.

03/23/20: 2.18Hrs
5: All of the rivet holes required to attach the tailcone to the fuselage were installed.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.