02/26/20: 4.77Hrs 1: Some wires were routed forward through the firewall. 2: The X3 connector was assembled and connected to the fusebox. 3: The ring terminals called out were connected to the generator A and B grounds (K-6256 had to be installed onto the A grounds because its terminal couldn't fit the B grounds. 4: K7125 was connected to the starter relay. 5: K7021 was connected to the master Relay. 6: K6284 was ground to the firewall and connected to the fusebox. 7: One modified AN931-6-16 grommet was installed onto the firewall, Tank Sealant was applied to the gaps between the grommets and wires. 8: The cushion clamps were installed onto the engine mount and used to secure the wires.
03/23/20: 0.33Hrs K-6256 was disconnected from the A grounds, a new terminal was crimped onto it so it could be installed on B grounds.