KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  3-23-2020
Number of Hours:  7.38
Manual Reference:  
Brief Description:  49iS-04

02/19/20: 2.07Hrs
1: The tunnel cover assembly was riveted to the fuselage.
2: The grommet was installed on the firewall and CT-01200 was fed through it.
3: CT-01200 was attached to F-01246A.
4: CT-01200 was inserted in VA-219-2, adjusted so it extended 7/16" and then the hardware was tightened.

02/20/20: 2.08Hrs
Worked on step 5.

03/23/20: 3.23Hrs
5: CT-01200 was secured to the engine mount.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.