03/02/20: 0.22Hrs 3 & 4: A 82.5" length of PT-035X1/4 was trimmed and routed aft from the left wing access hole on the fuselage to the tailcone.
03/04/20: 1.25Hrs 1: Q6300 was routed aft through the snap bushings in F-1204C-L and F-1204B-L. 2: F-00200 and ES E22-50K were installed to F-01248L-1 along with Q6300. 5: ES-00301 was riveted to F-01223-L-1 & R.
03/12/20: 0.5Hrs 6: The WH-P30-1 wires were routed forward through the snap bushings in the upper slots.