KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  3-12-2020
Number of Hours:  4.09
Manual Reference:  
Brief Description:  38iS/U-16

03/11/20: 2.42Hrs
1: The spacers required had already been fabricated while working on the previous plane.
2: The one of each rudder cable link was attached to one of each rudder cable.
3 & 4: With the spacer contacting the firewall, the left pedal was pushed in order to calibrate the L link, the same was repeated for the right pedal with the R link.
5: The links were trimmed up to the chosen hole, then they were primed.

03/12/20: 1.67Hrs
6: The rudder cable links were attached to the rudder cables and to the arms of WD-01206-1.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.