02/19/20: 2Hrs 1: Both A-1211s were greased. A-1207 L&R will be greased after the flaperon is painted. 2: Flaperon locks were removed. The 1/8" shims for steps 4 and 5 were created.
02/20/20: 0.57Hrs 3 & 4: WD-01214 L&R were inserted onto the fuselage and slid outboard to engage to the flaperon, a 1/16" shim was inserted between A-1207 and WD-01214 5: The shims previously created were used to clamp the flaperons and leave a 1/8" offset downward.