02/19/20: 7.3Hrs Worked on steps 1-5 while making adjustments to the stub spars and the wing skins.
02/20/20: 4.77Hrs 1-5: Both wings were installed after making adjustments to the stub spars and wing skins. The left and right fuselage pins were greased and the installed along with the wings on the fuselage.