01/31/20: 6.5Hrs 1: The fluid fittings were installed to the brakes as instructed. 2: The wheels were installed as instructed. 3: Both brakes were installed and torqued. 4: The fuselage was lowered onto its wheels.
02/21/20: 0.58Hrs The bleeder valve for the right wheel was reinstalled.