01/16/20: 0.61Hrs 1. F-12127B was created by cutting 30 9/32" of aluminum tubing. 2. The nut and sleeve were inserted and the forward part of the tube was flared. Worked on step 3.
01/17/20: 1.25Hrs 3. The aft part of the tube was routed through snap bushing on the fuselage, after being routed, a nut and sleeve were inserted and the tube was flared. 4. The forward part was attached to its fitting. 5.The fuel line was attached to the firewall using the called out cushion clamp.