KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  1-16-2020
Number of Hours:  11.25
Manual Reference:  
Brief Description:  37iS/U-17

01/16/20: 9.5Hrs
1. Material was removed from both COWL-0009 to open their cooling slots.
2. Trimming COWL-0009 L&R was indeed required and completed.
3.Both COWL-0009 were placed inside the top cowl cutouts and adjustments were made in order for them to fit.
4. Both COWL-0009 were drilled #40.
5. COWL-0009 L&R were taped to the top cowl and used to match-drill it #40.
6. The areas that will be used to attach both COWL-0009 and the top cowl were sanded using 80 grit sandpaper.
7 The clecoc were coated with wax.
8. A layer of epoxy was applied to the sanded areas from the previous steps.
9-10 Both COWL-0009 were clecoed to the top cowl and both cowls were installed to the fuselage.
11.The same was performed for COWL-0001.

01/21/20: 1.75Hrs
All of the holes used to attach fiberglass parts and the one for the aluminum angle were filled with epoxy.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.