06/14/19: 1.5Hrs Fabrication of F-12127C began, a mistake was made so the line will have to be refabricated from scratch, this incorrect line will be recycled for other shorter ones.
06/17/19: 1.66Hrs 1. F-12127 was created by cutting 30 1/4" of aluminum tubing. 2.Its forward end was flared after installing its nut and sleeve.
01/17/20: 2.33 Hrs 3.The aft part of the tube was routed through HW-00014 on the fuselage, after this the aft part of the tube was flared after installing the corresponding hardware. 4. F-12127 was bent in order to align it with F-12127B, both of them were attached to the bypass fitting assembly. 5.F-12127C was attached to its forward fitting and the it was secured to the firewall.