KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  1-11-2019
Number of Hours:  5.18
Manual Reference:  
Brief Description:  10iS/U-08

01/10/19: 0.75Hrs
1. The assembly was turned over
2. F-1211 was clecoed to the cone skins.

01/11/19: 4.43Hrs
3. The J-stiffeners were hooked to the frames, then clecoed.
4. A string was routed forward to aft and then returned to the forward end, both ends were taped to the bottom skin.
5. WH-P30-1 was routed through the bushings, the red heatshrink was alligned with the last one.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.