GA Aerospace’s Web Site
|
Date: 6-23-2018
|
Number of Hours: 8.00
|
Manual Reference:
|
Brief Description: Sec 38, 38iS / U-03 and 38iS / U-07
|
|
Today steps 4, 5 38iS / U-03 were carried out, first we started preparing parts F-1261s and WD-01214 which were sanded on the surfaces where they were later to be joined, prepared epoxy and applied to them so that they could be adhered, maintain 1/8 of separate between each F-1261. before curing the epoxy of riveted holes that go through these pieces using rivets LP4-3. When the epoxy was already dry, it was verified that the gap between the F-1261s part would easily let the part A-1211 inside WD-01214. Finally, steps 2 3 4 and 5 38iS / U-07 were carried out by cutting the part F-1207E into 2 and then making a chamfer on both sides to each one, then in step 3, nutplates K1000-08D were installed in the part F-1284-L. In step 4 a hole with rivet LP4-3 is filled in part F-01273-L and finall-drill in the same hole but in piece F-01273-R. Finally, for each of them, 2 nutplates K1000-8D were installed.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |