KitLog pro

Powered By Kitlog Pro v2.0

Sonex 815 Build Logs
' style=
Date:  4-7-2008
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Large battery cables

Installed the large battery cables - ground to engine, + to starter solenoid, and laid in the ground to airframe, but didn't drill the firewall through hole. Also did an initial run of the + from starter to solenoid. This is the one that appears to be too long, but it came with the engine. Right at 1150 hours time logged on the project.
' style=

Orange is starter hot.

Orange is starter hot.

' style=

Starter hot, final clamping.

Starter hot, final clamping.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.