Installed the large battery cables - ground to engine, + to starter solenoid, and laid in the ground to airframe, but didn't drill the firewall through hole. Also did an initial run of the + from starter to solenoid. This is the one that appears to be too long, but it came with the engine. Right at 1150 hours time logged on the project.