KitLog pro

Powered By Kitlog Pro v2.0

Sonex 815 Build Logs
' style=
Date:  2-29-2008
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Cowling installation

Drilled hinges to final size. Deburred all on the RH cowling and riveted all on the RH cowling. Deburred the long hinge on the LH cowling and pulled every 5th rivet or so to hold the hinge in place.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.