Powered By Kitlog Pro v2.0
Matt's Hangar
GN-1
All
11-2-2014
< Previous Log Entry
Next Log Entry >
Date:
11-2-2014
Number of Hours:
0.20
Manual Reference:
Brief Description:
Update
Got cold all of a sudden here, so didn't work on the plane much. Thought I would take a weight on it, and so far it's about 60 lbs as it sits.
Going to start on all the metal fittings this week hopefully since we can do that in the cold - and of course the engine needs to be built as well.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
A-23 PROMETHEUS Home
GN-1 Home
Category
# Logs
# Hours
All
8
664
Fuselage
7
555
Miscellaneous
1
109
ME-10 BASTION Home
A-21 INTREPID Home
PA-38 Home
ME-1XL SKIMMER Home
Copyright © 2001-2024 Matronics. All Rights Reserved.