Brief Description: additional pics of rudder cable installation
Additional pics of July 12 work to route rudder cable and fabricate clamps. Aft skin was drilled and filed to make cable slot per plans. bulkhead holes were drilled and grommeted and the cable was routed thru them. Cable was also zip tied at several internal braces. AVERY RUDDER CABLE FAIRINGs will be added after cables are clamped and attached to rudder.