KitLog pro

Powered By Kitlog Pro v2.0

EDWARD'S WEB SITE
' style=
Date:  3-18-2011
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Riveted F-3 in place

Layed out rivet pattern on vertical angles and drilled. Located F-3 and match drilled to vertical angle. Located and drilled hole thru upper longeron and F-3 each side. Countersank rivet holes in upper longeron. Deburred and riveted both F-3 in place.
' style=

vertical angle being drilled for F-3

vertical angle being drilled for F-3

' style=

F-3 ariveting underway

F-3 ariveting underway

' style=

F-3 attached

F-3 attached

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.