KitLog pro

Powered By Kitlog Pro v2.0

DOUGs Web Site
' style=
Date:  3-14-2019
Number of Hours:  0.70
Manual Reference:  
Brief Description:  2 - HStab pass-through wire connectors

I soldered on the 6- pin connector for the servo connection of the horizontal stab pass through wire, and then soldered, assembled and labeled the fuselage side connector.
' style=

soldered pig tail connector to servo side of cable

soldered pig tail connector to servo side of cable

' style=

installing fuselage side connector

installing fuselage side connector

' style=

soldered, assembled & labeled

soldered, assembled & labeled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.