KitLog pro

Powered By Kitlog Pro v2.0

Harteveld, Chinook Plus 2
' style=
Date:  8-21-2016
Number of Hours:  2.00
Manual Reference:  Steps 7 & 8
Brief Description:  Implementing advice on Root Tube assembly, and jum

Factory advice on Step 7 was to pull the parts out of the vice and install in place, at top of Down Tubes. Did that. Took a while due to the need to ream and twist the parts a bit. Lot's of metal up there, some under tension. Finally was able to dry fit all, however. I still see the gap that caused the original concern, so uploaded another video to YouTube and emailed AM for advice.

In the interim, I stepped ahead to Step 8, and attached the Leading Edge Channel. Dry-fit, only. Don't want to cinch it all down in case the Step 7 issue requires some dis-assembly to mitigate.

Quickie Sunday session.
' style=

...and just like that, it gets three-dimensional

...and just like that, it gets three-dimensional

' style=

Front of Root Tube assembly

Front of Root Tube assembly

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.