KitLog pro

Powered By Kitlog Pro v2.0

Harteveld, Chinook Plus 2
' style=
Date:  8-20-2016
Number of Hours:  6.00
Manual Reference:  Step 7, Step 18
Brief Description:  Top keel, down tubes, and bungees

Leaping into Step 7, associated with assembling what willbe the top of the fuselage, and connecting it to the forward down tubes. Unfortunately, some consternation with placement of pre-drilled holes in theTop Window Plate. Great back-n-forth with the factory, though I have yet to learn verdict. As always, support form Aeroplane Manufactury is fast and fantastic.

In the interim, I skipped ahead to Step 18, bungee installation. some question about bolt/hole size, but I chose to forge ahead, regardless. Was able to install the bungees [great pix in the manual], but the instructions clearly stipulate that I should get two complete wraps, while I onlly had the mudcle/ leverage to make 1.5. Checking with factory to determine if that is okay.
' style=

Questions about hole alignment on the Top Window Plate

Questions about hole alignment on the Top Window Plate

' style=

Bungees! Is 6 cords on top enough?  What if I go on a diet?

Bungees! Is 6 cords on top enough? What if I go on a diet?

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.