Brief Description: HS411BPP & VA146 - Elevator Hinge
After side-clamp clecoing of VA146 and clecoing the assembly to the rear spar, it is easy to line up the VA146 bearing flange pre-drilled holes and to match-drill HS411BPP. Plans call for 4-5 rivets which I set with the pneumatic squeezer. Pic 3 shows me checking the shop head.