KitLog pro

Powered By Kitlog Pro v2.0

Damiens Web Site
' style=
Date:  4-13-2019
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Left elevator skin to skeleton prep

Cleco'd E-701-L skin to left elevator skeleton. Removed clecoes attaching E-705 root rib to E-702 left elevator spar. Clecoed and drilled WD-605-1-L left elevator horn to E-702 left elevator spar and E-705 root rib. Cleco'd and final drilled E-606PP aft spar to E-705 root rib. Final drilled E-701-L skin to the skeleton. Disassembled left elevator and deburred all parts.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.