Brief Description: Finished right elevator, started left elevator
Completed riveting on the right elevator. Finished attaching E-714 counter weight. Radiused the top and bottom aft facing edges of E-00001 hinge doubler for left eelvator so it would git flush against E-702 left elevator spar.