Brief Description: Finishing the left side of front spar reinforcemen
Carefully removed the left HS-801PP skin from the substructure, brushed it out and set it aside. Drilled the remaining holes in the left side of HS-810-1, HS-814-1 and HS-00003. Clecoe'd the new holes and checked for alignment and flushness. The HS-00003 doubler "fingers" were showing a slight "overbend" until they were clamped in place. Remeasured the overall total bend with a protractor to confirm 6° bend per construction drawing. "Drilling The Horizontal Stabilizer: Left" Completed.