Conrads X-10 Build Log
' style=
Date:  9-4-2012
Number of Hours:  8.00
Manual Reference:  Baffling Install
Brief Description:  Firewall Foward Section 2 Baffling Installation Fi

Sept 4th 2012

Spent most of the day at the hanger working on the engines air cooling baffling system. This spring 2012, I had already created most of the system in the Firewall Foward Section 2 but needed to installl, test fit and finish, test fit and correct errors and differences as necessary. I would say that I am 2/3 completed but need to hang the engine and install the Upper and Lower Cowl system to complete the install. For the most part the IO-540's Air Baffling system that was designed for the D4A5 engine fits the A1D5 engiine with very little or no out of the ordinary modifications.

Time about 8 hours.
' style=

Baffling Installation In Progress

Baffling Installation In Progress

' style=

Another View of Checking the Fit and Finish of the Engines Baffling System

Another View of Checking the Fit and Finish of the Engines Baffling System