KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  4-5-2011
Number of Hours:  1.00
Manual Reference:  FF2-2
Brief Description:  ocated the CB-1000A and CB-1000E Baffle Stiffeners

04/05/2011
FF2 COWL BAFFLE
FF2-2
Step 1 …. Located the CB-1000A and CB-1000E Baffle Stiffeners and created the following parts:
CB-1010G, CB-1002G, CB-1002B and the CB-1008B.
Step 2 …. Located the CB-1004C and CB-1010B and removed the hatched area.

Step 3 …. Located and broke into two pieces the CB 1002C Left Air Dam and 1010C Right Air Dam.
Then removed the alodine from all the parts in preparation of painting with High Temperature paint.

Time one hour
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.