KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-5-2011
Number of Hours:  2.00
Manual Reference:  FF2-3
Brief Description:  CB-1005A Cylinder 6 Aft Baffle.

04/05/2011
FF2 COWL BAFFLE
FF2-3

Step 1 …. Drilled four #30 pilot holes in the CB-1005A Cylinder 6 Aft Baffle.
Step 2 … After receiving the VA-187 Flanged Duct from Van’s next week I will cut the 4” hole in the CB-1005A Cylinder 6 Aft Baffle as shown in figure 1.
Step 3 … Then center the VA-187 4” Flanged Duct and Match-Drilled #30 the holes as shown in figure 1.
Step 4 …. Using a Unitbit I enlarged the two pilot holes to 3/4 inch and then filed the excess material joining them as shown in figure 1.
Step 5 …. Deburred the edges and holes in preparation for riveting.
Step 6 … When the necessary part arrives I will rivet the VA-187 4” Duct Flange to the CB-1005A Cylinder 6 Aft Baffle.

Step 7 …. I clecoed the CB-1003C and CB-1004B Double Plates to the CB-1004A Cylinder 6 Aft Baffle and final drilled #40 the holes.
Step 8 …. Dissembled, deburred and dimpled the rivet holes in the doubler plate and the cylinder 6 baffle.
Step 9 …. Then I riveted the CB-1003C and CB-1004B Double Plates to the CB-1004A Cylinder 6 Aft Baffle using AN426AD3-3.5 rivets.

Time about 2 hours.
' style=

CB-1005A Cylinder 6 Aft Baffle

CB-1005A Cylinder 6 Aft Baffle

' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.