KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  5-22-2011
Number of Hours:  20.00
Manual Reference:  Carpet Air Filter
Brief Description:  Completed the carpeting set for the X-10, and the

05/22/2011

Completed the carpeting set ( There are 15 pieces) for the X-10. The finished product looks great and matches the seats perfectly. I secured the carpet with industrial Velco and some carpet tape. The carpet InstaBind for sealing the edges of the cut pile carpet makes for a very professional look.

I am also working on the Firewall Forward part Filter By-Pass Door install.

Time about 20 hours for all the carpet work.
' style=

The X-10 Carpeting Set

The X-10 Carpeting Set

' style=

The X-10 Carpeting Set (mostly completed)

The X-10 Carpeting Set (mostly completed)

' style=

FWF -- Filter By-Pass Door on Air Box

FWF -- Filter By-Pass Door on Air Box

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.