KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  11-20-2010
Number of Hours:  10.00
Manual Reference:  Supplemental
Brief Description:  Adding a inspevtion door to the Wheel Fairings

48-11 Supplemental

I am adding a Inspection door to the Wheel Fairings. I have decieded after much debate to add a 3" X 4" Inspection Door to be able to view the inside of the Wheel Fairing and check the Tire Air Pressure without removing the Front Wheel Fairing. I ordered a Concealed Hinge from McMaster-Carr and a Cam lock. The idea is like a Cessna 172/182 as to be able to easlily check the tire as a pre-flight inspection if i want too.

Also, completing the Upper Gear Leg Fairings Left / Right, Pictured as covered with Super-Fill Epoxy berfore sanding smooth and finally a coat of UV Smooth Prime.

Time estimated at 10 hours for both Wheel Fairings.
' style=

Adding a Inspection Door to the Wheel Fairings  ( Shown in Rough Stage of Completion)

Adding a Inspection Door to the Wheel Fairings ( Shown in Rough Stage of Completion)

' style=

Completing the Upper Gear Leg Fairings Left / Right

Completing the Upper Gear Leg Fairings Left / Right

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.